[email protected] UK +44 20 3667 6717 USA +1 332 699 9499

Cloud & Server Migration Services

Move a production workload with a written cutover and a rollback path. You keep the provider.

Migration path from the current host through copy and validation to a target host, then cutover with a rollback path

The migration job

Move production to a host you own, without losing the path back.

Stay on the same provider or switch accounts you control. ADGLOB plans the sequence. You keep the relationship.

  1. Current hostWhat actually runs in production
  2. InventoryApp, data, DNS, certs, cron, secrets
  3. Copy and validateTarget host, integrity checks
  4. CutoverDNS or origin switch with owners
  5. RollbackHow to point back, and who decides

Process

What a migration engagement usually covers

Assessment

Hosts, services, data, DNS, certificates and the hidden cron jobs.

Architecture

Target size, disk, network and how the app will run after the move.

DNS planning

TTL, the record that must change, and how users reach the new origin.

Data and files

Copies with integrity checks. Large files are scoped, not assumed instant.

Database

Dump/restore or replication, chosen for size and acceptable interruption.

Application

Runtime, config, queues and the first request that proves it works.

TLS

Issue or transfer certificates so HTTPS survives the cutover.

Validation

HTTP, login, jobs and data checks before cutover is treated as done.

Use cases

  • Host-to-host inside an account you already operate
  • Leaving a host that is failing, undersized or out of support
  • Collapsing several small servers onto a layout that matches the application
  • Moving a workload closer to users or to hardware you prefer — still billed to you

What this is not

  • Not a promise that every application can move without a maintenance window.
  • Not ADGLOB taking over your cloud contract or domain by default.
  • Not a claim of official partnership with any named cloud or VPS brand.

Start with what is in production today

Bring the current host, the DNS, the data size you know about, and whether the target is the same provider or a different account you control.

FAQ

Common questions

Do you promise zero downtime?

No. Downtime depends on DNS, data size, application design and cutover method. We plan to reduce disruption and agree the approach in the proposal. Zero downtime is only claimed if it is specifically engineered for that workload.

What do you migrate?

Typical scopes include applications, databases, files, TLS certificates, cron jobs, firewall rules and DNS. Exact scope is defined after assessment — hidden dependencies are the usual surprise.

Can I keep the same provider?

Yes. Many moves are host-to-host inside an account you already operate. Changing provider is optional and only happens if you decide to.

Who controls DNS at cutover?

You do, unless you ask us to operate the zone. We plan TTL, the record change and how to reverse it. We do not seize a domain as part of the migration.